Stadium Middlesbrough · TS3 6RS

Could Riverside Stadium go solar?

Middlesbrough's Riverside Stadium sits by the Tees with big stand roofs enclosing the pitch on all four sides. Across roughly 11,000 sq m of that roofing, a full solar fit-out might run to about 3,700 panels and 1.5 MW. Our figures suggest an estimated 1.0–1.2 million kWh a year — enough, in theory, to match around 410 homes. Northern sunshine keeps the numbers measured.

Loading solar imagery

Drag the handle — aerial photo left, Google Solar's measured annual sun intensity right. Brighter means more energy landing per square metre.

Roof capacity
1.5 MWp
~3,728 panels at full fit
Annual generation
1.0 GWh–1.2 GWh
across the whole roof
Could power
~414
average UK homes
CO₂ saved
~536 t
per year, at full capacity

Roof area read from above: ~11,008 m²on a 25,549 m² building footprint.Imagery dated 2024-10-05.

Full methodology, assumptions and cross-checks: how we measure. Includes solar data from Google.

Riverside Stadium from above

Middlesbrough's Riverside Stadium from above, four pitched stand roofs boxing in the green playing surface on the town's riverside.

See the full stadium solar league table →

Morning sun on the rooftop solar panels of a red-brick UK semi-detached home

That was someone else's roof.

Check your own roof.

Enter your property number and postcode today, and we'll read your roof from the sky to get a better understanding of whether or not your roof is suitable for solar panels. Free, takes minutes, and no account necessary.