Next Phase Electric
About
Next Phase Electric designs home solar around roof space and electrical load, and also installs batteries and EV chargers. Its website says it reviews panel capacity, handles the related electrical work and repairs underperforming systems. It works in Bakersfield and nearby Central Valley communities.
At a glance
- Licensed since 2017.
- Also licensed for electrical work, including main panel upgrades.
- Since 2021, public records show about 3,290 home solar installs, 2,590 of them in Kern County.
- A mix: some bought by the homeowner, some leased.
- Some included a battery.
What Next Phase Electric offers
- Home solar
- Battery storage
- EV chargers
- Solar repairs
- Electrical work
- Financing
- Reviews panel capacity and electrical work
- System diagnostics and repairs
From Next Phase Electric's own website. Confirm what's included in your quote.
Install record
See the full record
- Home installs since 2021
- 3,285
- Typical system size
- 7.5 kW
- Leased or power purchase agreement
- 12%
- With a battery
- 12%
- Panels used most
- Hanwha Q CELLS, Trina Solar, ZNSHINE PV-TECH
Residential systems in LBNL Tracking the Sun 2026, Lawrence Berkeley National Laboratory's record of US solar installs, through Dec 2025.
Where Next Phase Electric installs
California counties with five or more recorded home installs since 2021.
- Kern County 2,588
- Fresno County 256
- Tulare County 201
- Los Angeles County 75
- Kings County 29
- San Bernardino County 24
All 14 counties
Going solar in Kern County, California: what to expect
A site visit, then a design
Expect the installer to look at your roof and your electric bills before giving a firm price. The quote should name the panels, the inverter, any battery, and the system size in kW.
Batteries come up a lot
PG&E, SCE and SDG&E homes that go solar now join the Net Billing Tariff, which pays far less for power you send back than you pay for power you use. That's why many California quotes include a battery: storing your own power is often worth more than exporting it. City-run utilities such as LADWP and SMUD set their own rules, so check yours.
Paperwork they should handle
The installer pulls the building permit from your city or county and applies to your utility to connect. You switch the system on once the utility grants permission to operate.
What to check before you sign
Ask for their CSLB license number and check it on the CSLB site. With the contract you'll be given the California Solar Consumer Protection Guide to read and sign, and you have at least three business days to cancel for any reason (five if you're 65 or older).
Solarable lists installers and checks state records. We don't audit individual installations, so get an on-site survey to confirm what's right for your home.