Hooked On Solar
About
Hooked On Solar is a licensed solar installer based in Rocklin, California.
At a glance
- Licensed since 2010.
- Also licensed for electrical work, including main panel upgrades.
- Since 2021, public records show about 3,350 home solar installs, 741 of them in Placer County.
- Almost all were bought by the homeowner (cash or a loan), not leased.
- About 40% included a battery.
Install record
See the full record
- Home installs since 2021
- 3,345
- Typical system size
- 6.6 kW
- Leased or power purchase agreement
- 1%
- With a battery
- 37%
- Panels used most
- SunPower, REC Group, WAAREE ENERGIES
Residential systems in LBNL Tracking the Sun 2026, Lawrence Berkeley National Laboratory's record of US solar installs, through Dec 2025.
Where Hooked On Solar installs
California counties with five or more recorded home installs since 2021.
- Placer County 741
- Alameda County 522
- Contra Costa County 466
- El Dorado County 334
- Santa Clara County 255
- Yolo County 141
All 27 counties
- Solano County 118
- Nevada County 117
- San Joaquin County 107
- Butte County 105
- Yuba County 60
- Napa County 57
- Sutter County 42
- Amador County 37
- Marin County 36
- Sonoma County 32
- San Mateo County 31
- Calaveras County 26
- Shasta County 19
- Tuolumne County 18
- Colusa County 15
- Tehama County 13
- San Diego County 11
- Lake County 7
- Monterey County 6
- Santa Cruz County 5
- Stanislaus County 5
Going solar in Placer County, California: what to expect
A site visit, then a design
Expect the installer to look at your roof and your electric bills before giving a firm price. The quote should name the panels, the inverter, any battery, and the system size in kW.
Batteries come up a lot
PG&E, SCE and SDG&E homes that go solar now join the Net Billing Tariff, which pays far less for power you send back than you pay for power you use. That's why many California quotes include a battery: storing your own power is often worth more than exporting it. City-run utilities such as LADWP and SMUD set their own rules, so check yours.
Paperwork they should handle
The installer pulls the building permit from your city or county and applies to your utility to connect. You switch the system on once the utility grants permission to operate.
What to check before you sign
Ask for their CSLB license number and check it on the CSLB site. With the contract you'll be given the California Solar Consumer Protection Guide to read and sign, and you have at least three business days to cancel for any reason (five if you're 65 or older).
Solarable lists installers and checks state records. We don't audit individual installations, so get an on-site survey to confirm what's right for your home.