Bright Ops
About
Bright Ops is a licensed solar installer based in Worcester, California.
At a glance
- Licensed since 2016.
- Also licensed for electrical work, including main panel upgrades.
- Since 2021, public records show about 41,360 home solar installs, 6,650 of them in San Diego County.
- Most were leases or power purchase agreements, where the homeowner pays monthly for the system or its power.
- About 40% included a battery.
Install record
See the full record
- Home installs since 2021
- 41,361
- Typical system size
- 6.3 kW
- Leased or power purchase agreement
- 84%
- With a battery
- 35%
- Panels used most
- Hanwha Q CELLS, LONGi Green Energy Technology, JA Solar
Residential systems in LBNL Tracking the Sun 2026, Lawrence Berkeley National Laboratory's record of US solar installs, through Dec 2025.
Where Bright Ops installs
California counties with five or more recorded home installs since 2021.
- San Diego County 6,648
- Riverside County 5,156
- San Bernardino County 4,766
- Los Angeles County 3,864
- Contra Costa County 2,319
- San Joaquin County 2,240
All 47 counties
- Orange County 1,782
- Santa Clara County 1,713
- Kern County 1,661
- Fresno County 1,277
- Solano County 1,189
- Tulare County 1,102
- Alameda County 1,012
- Placer County 688
- Sonoma County 506
- El Dorado County 477
- Merced County 429
- Yolo County 399
- Ventura County 370
- Butte County 282
- Kings County 279
- Sutter County 247
- San Mateo County 241
- Lake County 237
- Madera County 233
- Santa Barbara County 229
- Monterey County 192
- Yuba County 192
- San Luis Obispo County 165
- Napa County 142
- Tehama County 138
- Marin County 135
- Nevada County 121
- Amador County 118
- Stanislaus County 117
- Santa Cruz County 102
- Calaveras County 87
- San Benito County 87
- Shasta County 85
- Tuolumne County 85
- Mendocino County 67
- Glenn County 50
- Colusa County 43
- Mariposa County 18
- San Francisco 18
- Sacramento County 8
- Alpine County 5
Going solar in California: what to expect
A site visit, then a design
Expect the installer to look at your roof and your electric bills before giving a firm price. The quote should name the panels, the inverter, any battery, and the system size in kW.
Batteries come up a lot
PG&E, SCE and SDG&E homes that go solar now join the Net Billing Tariff, which pays far less for power you send back than you pay for power you use. That's why many California quotes include a battery: storing your own power is often worth more than exporting it. City-run utilities such as LADWP and SMUD set their own rules, so check yours.
Paperwork they should handle
The installer pulls the building permit from your city or county and applies to your utility to connect. You switch the system on once the utility grants permission to operate.
What to check before you sign
Ask for their CSLB license number and check it on the CSLB site. With the contract you'll be given the California Solar Consumer Protection Guide to read and sign, and you have at least three business days to cancel for any reason (five if you're 65 or older).
Solarable lists installers and checks state records. We don't audit individual installations, so get an on-site survey to confirm what's right for your home.